Itp For Excavation And Backfilling

All high pressure piping installed (piping which will operate above 125 PSIG) shall be pressure tested with water as the testing medium prior to being placed in-service. The innovation involved construction of 20 Reinforced Earth® structures. *Coordinate with the client representatives to ensure that inspections are carried out expediently. Test Records Electronic Process. com so finally today I'm going to share for "Download Excel Sheet for Civil Work Quantities" Let's go and Download the spreadsheet or Excel File. August - Plant Vogtle Units 3 and 4 received an ESP from the NRC. Fahad Bin Nasir is an excellent engineering professional with management skills within infrastructure operation, engineering and construction industry. 2081-2009-005-03 removal of water from behind the cofferdam and backfilling of soil is including areas used for ingress and egress routes during construction. 11 Standards on site AS/NZS3500 4. Jose Rebecco ay may 10 mga trabaho na nakalista sa kanilang profile. 1 Date of last revision: 18 Jun 10 Page 6 of 17 This document is uncontrolled when printed. - Approved vender Drawing - Approved drawing - Technical specification(SEC) Inspection Method / Acceptance Criteria - Check fuse rating, main parts rating / type. EXCAVATION & BACKFILL SPECIFICATION 3 The terms "maximum density" and "optimum moisture content" shall be as defined in ASTM D698. 1 Section 4. The main factor which affects an earthworks job is the effect of wet weather. Types of protective systems include sloping, shoring and shielding. • FM-003 Gradation of Fill Material shall be compliance to Specification for Earth Works , 13530-43 C2 , Engineering Standard. 1 The purpose of this procedure is to meet the min. INSPECTION CHECKLIST DUBAI HILLS PROJECT SECTION :- EXCAVATION (CUT & FILL). Tingnan ang kompletong profile sa LinkedIn at matuklasan ang mga koneksyon at trabaho sa kaparehong mga kompanya ni Jose Rebecco. • Operator completes the Excavation/Backfill ITP. Workers must be protected from wet concrete by use of protective gloves and boots and from the effects of silica dust by avoiding the need to scabble by using a retarder or by the provision of respirators. 3 topsoil for re-use 24 3. Scribd is the world's largest social reading and publishing site. 1 General Special precautions shall be taken to prevent wedging action against abutments, retaining walls or culvert walls. G)Contents1 Method Statement for Pouring Concrete on Slab on Grade (S. ITP for Excavation a nd Backfilling - 0500604-ITP-00-CA-001 R ev C0 Check List for Excav ation - 0500604#18(EXC-RE) Rev#1. EXCAVATION & BACKFILL SPECIFICATION 3 The terms "maximum density" and "optimum moisture content" shall be as defined in ASTM D698. o All Activities for Excavation and Backfilling Works. Printed copies are uncontrolled. 1 Civil Engineering Blog Expertcivil. All high pressure piping installed (piping which will operate above 125 PSIG) shall be pressure tested with water as the testing medium prior to being placed in-service. Construction Engineering Items. When inputted into SiteManager, the frequency may be translated to a "number format" such as 1 per 500cy that roughly represents the "word format". 15 Dry wall partition. d) Before and during construction to determine the method and frequency of construction control tests to be carried out, determine the reliability of the testing and to evaluate the significance of test results and field inspection reports in assessing the quality of the finished work. 1 Ergon Energy Controlled Documents 4. This edition contains 5-digit WINs for all. o) AC High Voltage Test Kit / VLF Test Kit p) Manual Excavation Tools q) Removable Barricades 6. 06 Protection work to substructure works 7 ITP. Will be placed below the elevation of the bottom of the box and end sections. Excavation, Trenching and Backfilling for Utilities Systems, A Guide Specification for Construction by the U. Compaction equipment can be used at this point (see Standard drawing 220). Civil Works - General - Inspection Test Plan (ITP) - Submit ITPs. Perform site inspection / Monitoring of active like excavation , backfilling ,compaction ,Formwork ,Reinforcing bars, installations, Concrete placement are implemented as per plane and in according with project specification. Payment can be made by PayPal Pro secure server. Excavations, FDT, survey works, form work, rebar and concrete pour, curing, waterproofing membrane, concrete protective coating and backfilling. pilot villages. 7) Original Ground Level or as indicated on drawing to start the backfilling is checked/tested and approved 1. Excavation or unsuitable materials revealed. Reviewing sub-contractors material submittals, ITP & method statements; ensuring compliance with contractor quality documents, plans, procedures and audits. ITP and CHECKLIST. It is used for support of structural entities such as building foundations, roadways, walkways, and earth retaining structures to name a few. 03 EXCAVATION AND BACKFILLING 3-4 3. 0 Coat and Wrap 9. 1PREPERATION & PRECONDITIONS a) Permit to Work (PTW) if required shall be raised to the Owner/Engineer for the excavation clearly mentioning the location of work, size of excavation and levels. Types of protective systems include sloping, shoring and shielding. 00 5 HSR CP1 - JMA Railroad Review and Consultation $ 88,755. If particular site conditions require larger trench widths, the contractor must take the advice from the designer. 0 Field Welding 8. Get the Editable ITP Template for the Inspection and Test Plan for Installation of Electric Power Cables with Inspection Checklists to use them at construction sites. "No Man Is an Island" is a well known saying that seems to advance the thought that all persons are connected to each other by common goals and obligations. Completely a page for the solution of Building Design,Engineering & Construction. ENVIRONMENTAL MANAGEMENT AND CONSTRUCTION PLAN 3 APPENDIX F 1. Section Cost: $899. Workers must be protected from wet concrete by use of protective gloves and boots and from the effects of silica dust by avoiding the need to scabble by using a retarder or by the provision of respirators. The proper sequence of excavation and backfilling is required to optimise the process and prevent safety issues. Actually i'm a project in-charge of one of the road project in sarawak who quite interested with your explanation on Hard Material / Rock Excavation which your good self had defined it in "6. To create a Checklist from your ITP, simply change views using the ITP Context Menu, and specify the Check, Verify and Approve status for each line by toggling check boxes. 5 All the inspections shall be done as per the notification for inspection (NFI). The designated competent person leading the operation takes a central. These works involve installing 1350 pipelines up to 4m deep in running sand material. 1 "Backfill of. Excavation, Sand Padding and Backfilling Regular programmed maintenance activities Bridge crossing maintenance Pipeline marker programs Pipeline pressure and leak testing Close Interval Surveys Cathodic protection programs Construction Services EPC Services Temporary Facilities & Site Preparation. 8 Excavation shall be provided with warning barricades, warning signs and flash light and also protected the perimeter of excavation by concrete barrier. Section Cost: $3984. • Review and verify all ITP’s, QCP and Method Statements that submitted by the subcontractor for final approval to the client. 17 years overall experience in various ready mix concrete (design and calculate fresh concrete design mix based on ACI 211. To improve the impermeability of the concrete, water-resisting admixtures can be added. 0 Completion Remarks: H - Company’s presence is mandatory for all activities in section. The probe provides large-capacity water jets, which act downward and sideways, flooding the soil and breaking the surface tension. Purpose: To control and provide guidance for the management of flammable liquids which are increasingly being used on construction sites. 11 including PV PIP CV02100(section 4. Under EPA regulations, the execution of a delega- tion agreement between an RA and a comparable level State official provides the basis for a construction management assistance (CMA) grant (frequently referred to as a 205(g) grant). Definitions and Abbreviations Flammable Liquids: Defined as those that have a flash point of less than 32°C and supporting combustion at 50°C. Tomi NISSINEN: NAMI: Productivity: In Progress. Compaction equipment can be used at this point (see Standard drawing 220). We provide professionally developed method statements, ITP's, checklists, risk assessments and other project related documents. Used to adhere to the ISO 9001 standard for quality management ITPs set out critical points at various stages within a process for scheduled inspections and verifications. specified backfill material. Various methods for dewatering of excavations are described in this article. As the project proceeds, work task plans provide additional details of how. 5 For foundation, as soon as the excavation reaches the required depth. ITEM #1001001A – TRENCHING AND BACKFILLING. txt) or read online for free. X R I • Suitable excavated material shall comply to 7. It is typically made of concrete with rebar reinforcement. 2 Preparation1. Slurry wall construction cost for cut-off barries is considerably cheeper than diaphragm wall construction for deep excavations. C EN Designation QC INSPECTOR Duration MAY 2013 TO FEB 2014. 2 Overview of methods Quantitative methods aim to estimate both the probability and consequences of adverse. Project manager of the drainage works on the bay fair to bay park roading upgrade. BURIED APPLICATIONS 20 Verify that a test post has been installed 21 Confirm if a surge diverter has been installed 22 Ensure the flowmeter is waterproofed before backfilling. 0 Excavation and formation While laying in trenches the contractor must ensure the bottom trench width is as per design specification. If particular site conditions require larger trench widths, the contractor must take the advice from the designer. Update the ITP based on the requirements of MRWA and conduct Inspection and Testing in accordance with the Plan. docx from MANAGEMENT 501 at Manipal University Dubai. 15 Dry wall partition. The construction was located aboard the base in an area that had been reclaimed from the surrounding swamps. 2 BR / ADOS Prior to Start Work Approved Submission Review Each unit type - As per Specification Method Statement 1. SME’s construction monitoring and testing services include overseeing the construction of shallow and deep foundations, as well as underpinning. Irrigation – Excavation and installation – Backfilling trenches – Inspection Irrigation – Completion – Work as-executed drawings Irrigation – Shop drawings. Tie-in points/interferences encountered during project construction. 0 TRENCH EXCAVATION 2. Purpose and scope 1. I W W Checklist PS4 5 Base slab Visual inspection to WRC Standards. P:\Duluth\49 WI\16\4916146 Dig Review\WorkFiles\SubSections\Line 5\1430_2797_032112\Internal\ITP and HCP\HCP final February 2013\HCP_L5_3 MPs at 1430_final_Feb2013. The OSHA standard for trenching and excavation requires protective systems for trenches that are 5 feet or deeper, unless the excavation occurs in stable rock. Inspection & Test Plan (ITP) - An Inspection & Test Plan is the program of inspection, testing of materials, and survey shall be prepared and submitted by the contractor to the Engineer for approval before usage and application to the site. Test Records Electronic Process. builder wants to backfill with the existing dirt from the excavation, but I told him to use gravel or crushed stone instead of the high clay content soil to better promote drainage. Foundations. Shield system placed to prevent lateral movement. "No Man Is an Island" is a well known saying that seems to advance the thought that all persons are connected to each other by common goals and obligations. In case of conflict between SiteManager and the ITP frequency, the ITP should govern. Each specification suite may consist of a Technical Specification (MRTS) and/or a Specification (Measurement) (MRS), with Annexures as required. pilot villages. Adams Independent Environmental Assessment and Verification Oak Ridge Institute for Science and Education Oak Ridge, Tennessee 37831-01 17 Prepared for the. ) Material Receiving Inspection of Refractory Materials. 2 Overview of methods Quantitative methods aim to estimate both the probability and consequences of adverse. • FM-003 Gradation of Fill Material shall be compliance to Specification for Earth Works , 13530-43 C2 , Engineering Standard. railway construction project, Reinforced Earth completed a world first: reinforced backfill retaining walls under railway lines carrying high-speed trains travelling at a rate of speed of 352 km/h. IS1200: This code deal with excavation and backfilling of earth and in specific their measurement. There are 2 ITP Group fields provided and are used for classification, sorting and grouping of similar ITP's, for example ITP's such as clear and grub, backfill, excavation etc might have a group 1 (Discipline) of "Civil" and a group 2 (Task) of "Earthworks". I worked in the External Work dept. There is a planned striking procedure that everyone is made aware of before the work commences. Stream Channel Work. - Transmitter Remote Diaph. Definitions and Abbreviations Flammable Liquids: Defined as those that have a flash point of less than 32°C and supporting combustion at 50°C. Demolition, Breaking off, Excavation and Backfilling; Building Alterations & Building Construction; Concrete structures and reinforcement; Thermal Insulation ; Waste & Rain water piping systems; Industrial concrete flooring. Earthwork (except structural excavation and backfill) Clearing and Grubbing. We are planning to build a huge online community of Project Managers offering thousands of how-to articles, templates, project plans, and checklists to help you do your job. 2 billion ($600 million) development is on track for the expected delivery date of June 2020, a statement said. Retaining Walls not attached to the Abutment. (ITP), Quality control plans. to describe the construction of fully automated non man entry pipe jacked tunnels in smaller diameters, the term is now also sometimes applied to fully automated pipe jacks in larger diameters which may be controlled from above ground. The company will carry out the first-phase deep services contract, which will see it complete excavation and backfilling for pipes needed for the area's district cooling network across the Zahra and Hayat Townhouse communities. These includes and not limited to; Project design & management, Power transmission line construction, Telecom site build & colocation upgrade, Effective material & personnel resource deployment, Quality management & process improvement, Telecom customer equipment. (Water Proofing, Painting, Gypsum Board etc. Yes, you can make it in one ITP. - Preparing RFI (Request for Inspection) for all civil activities like Excavation, Backfilling, FDT (Field Density Test), etc - Monitor progress through multiple mechanisms including daily and weekly reports besides meetings. • FM-003 Gradation of Fill Material shall be compliance to Specification for Earth Works , 13530-43 C2 , Engineering Standard. ITP100-006 Signs, Devices and Linemarking. The pre-qualified Applicants will be invited to submit bids for an Invitation to Bid, (hereinafter: the ITB) and RFQ (hereinafter: the RFQ) for UNDP Somalia construction work(s) projects; where technical and. 3 Excavation Visual inspection to WRC standards. • Inspection of formwork, rebar work, coating, anchor bolts position etc. Invite other people (internal and external parties) to collaborate on and signoff on your ITP in real-time. Abbreviation » Term. TRENCHING, BACKFILLING, AND COMPACTING STD SPEC 02223 - 1 STANDARD SPECIFICATION SECTION 02223 TRENCHING, BACKFILLING, AND COMPACTING PART 1 - GENERAL 1. Work comprised excavation, erection of manholes, inspection chambers, catch basins and all other items in the networks, follow the ITP (inspection and testing plan) as per the project quality plan. 1 excavation 24 3. Purpose: To control and provide guidance for the management of flammable liquids which are increasingly being used on construction sites. PLANT CONSTRUCTION 2,857 views. 1 Throughout the construction of the project the Contractor shall complete and submit all records mentioned in the above sections of this document. THE BACKFILL SOIL PILE, AND PORTIONS OF BACKFILLED SURVEY UNITS AND CLASS 3 IMPACTED AREAS AT THE BIG ROCK POINT RESTORATION PROJECT CHARLEVOIX, MICHIGAN Prepared by W. The excavation checklist is followed by structural work, by trench buttressing and soil compaction procedures. California Endangered Species Act Incidental Take Permit No. relevant construction safety acts and regulations shall be used. Scribd is the world's largest social reading and publishing site. This part is a TEMPLATE which shall be filled in as part of all water pipeline designs. WHO IS REQUIRED TO FILL OUT ITPS? • Coater completes the Coating/Painting ITP. The CPWD Specifications were first compiled in 1950. 00 4 Herndon Avenue Alignment Changes (ATC) – Construction Supplemental Cost $ 64,568,236. experience across telecommunication and power transmission sector. The following is a list of SPECIFICATIONS, which may be related to this section: 1. to describe the construction of fully automated non man entry pipe jacked tunnels in smaller diameters, the term is now also sometimes applied to fully automated pipe jacks in larger diameters which may be controlled from above ground. Many times when the road passes through an area whre there are changes of water trying to cross the road thr. Agenda! • Backfilling. He is highly motivated and like to face challenges during his work. Buscar Buscar. Wet classification is a construction process that looks at the size of particles that make up the underlying soil in a project site and the flow of fluids through those particles. Shield system placed to prevent lateral movement. Construction of the walls commenced in April 2013 and was completed in July 2013, with total construction duration of three months. The detailed method of statement is very similar to the method statement for bored piling works and shall be made available before construction commences on site. Stream Channel Work. Daily inspection with PMC for ITP mentioned witness points for Excavation, backfilling, Sludge /oil removal. Refer to construction code, this ITP must be modified and completed. •Review the relevant documents prior to start of construction e. 00 - Consisting of all 332 QC Checksheets at $12 Each. To create a Checklist from your ITP, simply change views using the ITP Context Menu, and specify the Check, Verify and Approve status for each line by toggling check boxes. supervision of all construction activities at site,coordinate with subcontractors,monitoring work with quality to work and follow HSE at site. Excavation checklists are an essential tool used during pre-operations to evaluate the jobsite, utilities and equipment, access means, area atmosphere and support systems to identify problems before they occur. 13530-43C1 General Excavation Method Statement shall be approved prior to Work Commencement. Method statement for excavation and backfilling works - Duration: 4:55. • Excavation, Backfilling and • Specifications, Applicable Standards & Approved Method Statements and ITP. Compaction equipment can be used at this point (see Standard drawing 220). pdf), Text File (. 1121 Open drains including kerb and channel (gutter) © AUS-SPEC (Oct 12) 4 Bellingen Shire Council - January 2014 2 PRE-CONSTRUCTION PLANNING. Subsequently, these specifications have been revised in the years 1962, 1967, 1977 and 1996. 1 Soil materials Backfilling Earth dike Underground piping and cable H 1. The final ranking of the ‘Top 30’ infrastructure companies was based on a comprehensive quantitative and qualitative analysis of the overall business performance of every company. docx from MANAGEMENT 501 at Manipal University Dubai. Site investigations for transportation projects have the objective of providing specific information on subsurface soil, rock, and water conditions. 2 SECTION 02200 - EXCAVATION AND BACKFILLING PART 1 - GENERAL 1. Perform site inspection / Monitoring of active like excavation , backfilling ,compaction ,Formwork ,Reinforcing bars, installations, Concrete placement are implemented as per plane and in according with project specification. Home > Division R Roadworks - Pre 1 July 2018 Division R Roadworks - Pre 1 July 2018 These parts specify requirements for roadworks and general construction, including drainage, earthworks, pavements, lighting, guardrail, Intelligent Transport Systems (ITS) and sundry works. d) Before and during construction to determine the method and frequency of construction control tests to be carried out, determine the reliability of the testing and to evaluate the significance of test results and field inspection reports in assessing the quality of the finished work. to provide a construction Quality Control. 1 General V. Many times when the road passes through an area whre there are changes of water trying to cross the road thr. 10 Inspection and Test Plan up to date 4. 2 Sewage System V. CONCRETE PLACEMENT INSPECTION CHECKLIST Quality control of concrete starts with inspection of concrete during pre-placement, during placement and post-placement. ITP100-006 Signs, Devices and Linemarking. In order to understand what we can provide you download and open one of our construction method statement by clicking this link. Company DESCON ENGINEERING PVT L. Over six (6) years of management and practical experience in every stage of the construction process from tendering to dilapidation recording, site establishment, service locating, drilling, excavation, services and structures installation, joining, backfilling, compacting, testing, surface restoration, commissioning, MDR documenting, report submission, variation establishment and. 3 Backfilling and compaction of Utility Trenches V. EXCAVATION AND BACKFILLING EXCAVATION Availability of permit. PCC or RCC, type of elements to be casted, such as RCC slab, columns, footing, beams, walls etc. Site Preparation, Excavation, and Backfill Specification May 2014 Process Industry Practices Page 5 of 18. 1 SCOPE This section provides for excavation, trenching and backfilling for storm sewers, sanitary sewers, water distribution mains, and other utility systems and appurtenances. Vangelsten, U. Wet classification is a construction process that looks at the size of particles that make up the underlying soil in a project site and the flow of fluids through those particles. Stream Channel Work. These forms are required to demonstrate to the client and end-user that proper measures are taken to assure a high quality end product. • Laborer completes the Concrete ITP. 0 Reinstatement 12. We provide professionally developed method statements, ITP's, checklists, risk assessments and other project related documents. ITP300-002 Drainage Excavation & Pipelaying. See ARTC Intranet for latest version. Common mineral forms of phosphorus include apatite, wavellite, vivianite, and phosphorite. MS Word & MS Excel files. • Operator completes the Excavation/Backfill ITP. Project manager of the drainage works on the bay fair to bay park roading upgrade. Useful Notes on Method Statement for Drainage Works - Civil Engineering 1. The main factor which affects an earthworks job is the effect of wet weather. Construction Engineer, proficient in project management and control, field inspection, technical and design management. Aggregate Various tests, including quality, freeze-thaw, and alkali-silica reactivity (ASR) are performed on aggregates used for road and bridge construction in Illinois. construction of the D-5 Trident Missile Production Facilities. Nevertheless, design and construction of a watertight concrete structure is a system approach, and waterproof concrete is only one element of it. Relevant Legislation. Backfill Type 1 and Type 2 fill: properties to Section 31 05 16 - Aggregates for Earthwork and the following requirements: Crushed, pit run or screened stone, gravel or sand. Superintendents endorsement of TTM and release. When pipe is listed by type, the Contractor may use any pipe material that meets the requirements of that type. The ITP survey was completed for Towers 80, 81, 82, 90, and 91, and the associated spur roads. Checklist completed. 2016 CONTRACT #: R-15-085-BF-0 DOCUMENT NUMBER: LC3. Construction Inspectors as a means of improving the construction quality of projects Improving the overall quality of work performed by Pipeline Construction Inspectors within the industry This document, in particular, is intended to support some of these broader objectives by. All additional excavation and backfilling required as a result of the improper use of equipment for excavation purposes shall be doneat the Contractor's own expense. Apply engineering application software for the design and ensure correct application of engineering standards including NESC, IEEE,ANSI, AISC and ACI. 1 Ergon Energy Controlled Documents 4. abbreviations which are used throughout construction in plans and the proposals (Figure 1-1). Cail Excavation was hired for this excavation job in Falmouth, Maine. How to Prepare ITP/QIP - Duration: 3:53. supervision of all construction activities at site,coordinate with subcontractors,monitoring work with quality to work and follow HSE at site. Work comprised excavation, erection of manholes, inspection chambers, catch basins and all other items in the networks, follow the ITP (inspection and testing plan) as per the project quality plan. Purchase this complete, editable ITP template for electrical cables installation for the low price that is less than the cost of an hour of your time. Over six (6) years of management and practical experience in every stage of the construction process from tendering to dilapidation recording, site establishment, service locating, drilling, excavation, services and structures installation, joining, backfilling, compacting, testing, surface restoration, commissioning, MDR documenting, report submission, variation establishment and. Backfilling progresses with removal of support system. com - id: 7428b-ZTU1N. Setting Out Excavation Blinding Concrete Formwork Steel Reinforcement Concrete Construction Concrete Protection Construction of Columns with Anchor Bolts Backfilling Grouting Setting Out- Pipe Rack Bases The center lines of the Anchor bolt group shall be set out and offset provided 2m on either side of the foundation as reference line for. 0 meter from the edge of excavation or shall be stockpiled to the area designated by the Engineer. Excavation, Sand Padding and Backfilling Regular programmed maintenance activities Bridge crossing maintenance Pipeline marker programs Pipeline pressure and leak testing Close Interval Surveys Cathodic protection programs Construction Services EPC Services Temporary Facilities & Site Preparation. Excavations, FDT, survey works, form work, rebar and concrete pour, curing, waterproofing membrane, concrete protective coating and backfilling. Section 1 – Risk Assessment Document the hazards and analyse the risks associated with the excavation or digging activities to be undertaken. 1 excavation 24 3. Anti-Icing System. TRENCHING, BACKFILLING, AND COMPACTING STD SPEC 02223 - 1 STANDARD SPECIFICATION SECTION 02223 TRENCHING, BACKFILLING, AND COMPACTING PART 1 - GENERAL 1. Test Records Electronic Process. "The modifications were due to begin in mid-March, but the first aircraft only went into modification in early May," president Tim Clark reportedly said. Guardrail Transitions to Bridges. 1 Description This item shall consist of the excavation for the placing of structures, except pipe sewers, for the disposal of such excavated material and for the backfilling around completed structures to the level of the original ground or grade indicated. Trench backfill starts one (1) foot over the top of the pipe. The Duties and Responsibilil QA/QC Engineer January 15, 2014 The QC Inspector Duties Responsibilities January 26, 2014 Understanding About \ns and Test Plan (ITP) January 21, 2014 Method Statement for E> and Backfilling Works January 22, 2014 The 14 Possible Sources Issues and Defects in Coi - Part 1 July 18, 2016 OUR SPONSORS TRANSLATE THIS. Verify that all coating was acceptable as per ITP before being loaded out. Ladders used in excavations secured and extended three feet above the edge of the trench. Risk analyses in excavation and foundation work B. as infrastructure civil engineer. In This video i am going to tell you what is the basic things as a civil Engineer you should know during checking of Pcc and Backfilling work. • Part I covers general requirements on materials, design, reinforcement, manufacturing, acceptance, repair, inspection and product marking. ITP-01- Backfilling - Free download as Word Doc (. It comprised peer comparison, order book analysis, assessment of the diversity of projects as well as execution capabilities of these companies. : 31221097/00 Procedure / Spec. Protective Coatings - Contractor's Responsibilities - Provide documentary evidence of PCCP accreditation before. The final ranking of the ‘Top 30’ infrastructure companies was based on a comprehensive quantitative and qualitative analysis of the overall business performance of every company. 1 The purpose of this procedure is to meet the min. to eliminate risks associated with subsidence and collapse of sewer trench backfill Hence, roller optimum will vary from laboratory optimum. 2 Preparation1. 5 percent of the potential habitat at this site. All the inspections during field survey, Site preparation, Setting out, Excavation, Backfilling and Compaction shall be as per inspection and test plan (ITP) for earth work 6. Section 10. These tests quantify the physical characteristics of each aggregate product from each source. Once construction commences I will be the Site Engineer for the duration of the works. of pages: h - Company’s presence is. 1 Civil Engineering Blog Expertcivil. Army Corps of Engineers, dated November 1997. • Maintain and monitor all records of QC tools and equipment used in inspection • Check and monitor all civil works activities such as excavation, backfilling and conduct compaction test. • For steel pipes, the maximum section length is usually 40 ft. Useful Notes on Method Statement for Drainage Works – Civil Engineering 1. However, a landowner has the right to build up a foundation for a proposed building to any height. com so finally today I'm going to share for "Download Excel Sheet for Civil Work Quantities" Let's go and Download the spreadsheet or Excel File. New sub-clauses 3. Excavation & backfilling works on structures b. INSPECTION & TEST. See the complete profile on LinkedIn and discover Ionut’s connections and jobs at similar companies. Mr Abraham has 5 jobs listed on their profile. 000m soil nailing,70. During construction works it is the responsibility of the Construction Manager to maintain construction workforce training records. (Castables and Bricks etc. supervision of all construction activities at site,coordinate with subcontractors,monitoring work with quality to work and follow HSE at site. Earthwork (except structural excavation and backfill) Clearing and Grubbing. The probe provides large-capacity water jets, which act downward and sideways, flooding the soil and breaking the surface tension. Excavation of material to a level no greater than two feet below the bottom of the support system and only if the system is designed to support the loads calculated for the full depth. Fish and Wildlife Service (Service), announce our intent to prepare a draft environmental impact statement (EIS) for proposed issuance of an incidental take permit (ITP) under section 10(a)(1)(B) of the Endangered Species Act (ESA) for the draft Oil & Gas Coalition Multi-State. QA/QC activities within all the project production and erection activities interfaces with the customer and contractors with reference to all quality matters, Civil work; excavation, embankment, backfilling, massive concrete foundation pouring curing; Bolted Structural Steel works erection; Great & Small pressure, atmospheric tanks erection (API); Pipe lines for fluid transport Construction & erection hydrostatic test, flushing. Sample of Inspection and Test Plan (ITP) Project: Scope of Work: Engineered Wood Flooring This form serves as a guide only. • Other ITP's may be required depending on the scope of work. 1 Ergon Energy Controlled Documents 4. See the complete profile on LinkedIn and discover Khalid’s. These facilities included the construction of. [This section will require adjustment as Construction Contracting approach and detail further developed] 4. Anti-Icing System. • The standard is divided into two parts. INSPECTION CHECKLIST DUBAI HILLS PROJECT SECTION :- EXCAVATION (CUT & FILL). Manage your building construction ITP in the cloud to eliminate the uploading, downloading and emailing of fragmented documents. The ITP must be filled out while the task is being completed and should be completed by those doing the work. Individual lines can be excluded from either the Checklist or ITP with a single click. Compaction equipment can be used at this point (see Standard drawing 220). View John Gounaris’ profile on LinkedIn, the world's largest professional community. 2 Excavation 3-4 3. Master Builders Solutions is the BASF global brand of advanced chemical solutions for construction. Meanwhile, safety signage is erected, worker safety procedures are enforced, and the backfill stage arrives. • Preparation Notification for Inspection (NFI) for all civil activities like Excavation, Backfilling, FDT (Field Density Test), Lean concrete , Reinforce concrete, Curing, Moisture test, Surface preparation, Concrete coating (bitumen, epoxy, protection etc. • Scope of work is gas pipe line, buildings including structure work & finishing work, Roads, 380 KV Trench, excavation and backfilling, ASL Tanks for Treated & Untreated fuel, Solar Field Island and Dike Wall. Chlorine Required to Produce 25 mg/L Concentration in 100 Feet of Pipe-by Diameter Page 86 14. These reductions will, in turn, simplify the construction of the walls and minimize the overall schedule of the project. ITP100-005 Asphalt Seal / Bitumen Seal. Purchase this complete, editable ITP template for electrical cables installation for the low price that is less than the cost of an hour of your time. The ITP survey was completed for Towers 80, 81, 82, 90, and 91, and the associated spur roads. 000m ground anchoring,50. Shield system placed to prevent lateral movement. When inputted into SiteManager, the frequency may be translated to a "number format" such as 1 per 500cy that roughly represents the "word format". Bulk and Detailed Earthworks Irrespective of the size of the job, Whittens has the experience and expertise to deliver bulk and detailed earthworks packages to the industry. where an activity is not applicable then "n/a" shall be inserted against the appropriate operation remark ras laffan c iwpp / qatar discipline : hvac itp no. ITP for Earthworks or ITP for Excavation and Backfilling Works. outfall pipe line installation, bathymetric survey, construction of sea water intake, berth, jetty and. The process below describes how to manage Groups for ITP's. Four weeks prior to the proposed date for commencement of Inspection and Testing, the Contractor shall submit a draft ITP for assessment by MRWA. Section Cost: $3984. ITP100-004 Basecourse Construction. : 31221097/00 Procedure / Spec. •Review the relevant documents prior to start of construction e. Erect all necessary signage to serve notification that construction work, particularly excavation work is in progress in accordance with chapter 8 10. 000m ground anchoring,50. Section 10. A footing is a part of the foundation that helps support the foundation so that the structure does not settle. Witness the FJC process to ensure ITP requirements are met. Excavation, Backfill, and Compaction for Underground Piping 3. Since every project has its own specifications, thus it is imperative to base the processContinue Reading. • Review and verify all ITP’s, QCP and Method Statements that submitted by the subcontractor for final approval to the client. Type of inspection of concrete depends on type of concrete, i. 01 is amended as follows:. Here is a definition of TP. • Fitter/Welder completes the Hydrotest ITP. P:\Duluth\49 WI\16\4916146 Dig Review\WorkFiles\SubSections\Line 5\1430_2797_032112\Internal\ITP and HCP\HCP final February 2013\HCP_L5_3 MPs at 1430_final_Feb2013. 3 BR / ADOS Prior to Start Work. • Constriction of Electrical cable trenches and Concreting of Foundations etc Regarding Civil job. h h h h 11. Construction, Concrete related works Steel Structures, Heavy Foundations & Equipment Support Works, Fire Fighting Systems, Cable Laying Works. There is a planned striking procedure that everyone is made aware of before the work commences. 2 BR / ADOS Prior to Start Work Approved Submission Review Each unit type - As per Specification Method Statement 1. 0 Hydrostatic test duration hrs. Construction, Concrete related works Steel Structures, Heavy Foundations & Equipment Support Works, Fire Fighting Systems, Cable Laying Works. 04 Steel Reinforcement for concrete works 5 ITP. construction synonyms, construction pronunciation, construction translation, English dictionary definition of construction. Although it. In last 5 years since I know him ,he has an excellent connectivity with his colleagues, sub ordinates and carries professional. Buscar Buscar. take out materials leaving space above or below ground. ITP (Job): 1-03 1011 TTM ITP Template : PT 1-04 Temporary Traffic Management ITP No. • Preparation Notification for Inspection (NFI) for all civil activities like Excavation, Backfilling, FDT (Field Density Test), Lean concrete , Reinforce concrete, Curing, Moisture test, Surface preparation, Concrete coating (bitumen, epoxy, protection etc. These includes and not limited to; Project design & management, Power transmission line construction, Telecom site build & colocation upgrade, Effective material & personnel resource deployment, Quality management & process improvement, Telecom customer equipment. Type of inspection of concrete depends on type of concrete, i. WHO IS REQUIRED TO FILL OUT ITPS? • Coater completes the Coating/Painting ITP. Soil compaction is defined as the method of mechanically increasing the density of soil. 12 Procedures and plans to address special conditions are in place i. ITP100-005 Asphalt Seal / Bitumen Seal. 2 Backfilling and compaction of Structural Backfill V. 3 good practice. There are 2 ITP Group fields provided and are used for classification, sorting and grouping of similar ITP's, for example ITP's such as clear and grub, backfill, excavation etc might have a group 1 (Discipline) of "Civil" and a group 2 (Task) of "Earthworks". I worked in the External Work dept. See the complete profile on LinkedIn and discover John’s connections and jobs at similar companies. Approach Slabs. 9 Project Completion and Handover 9. Developed (ITP's) inspection test plans, and ran Coating Failure Analysis. Method Statement for Shoring Work Due Date Transmitted For Delivered Via Action Hand Items Qty Description 001 1 Approved ITP for excavation works. Earthwork in excavation and backfilling of soil upto required depth is required for construction of foundation and trenches. Jose Rebecco ay may 10 mga trabaho na nakalista sa kanilang profile. A thorough understanding of geotechnical engineering and knowledge of ground conditions is a pre-requisite for construction of a successful foundation. C Head Office O DESCON ENGINEERING L. Daily inspection with PMC for ITP mentioned witness points for Excavation, backfilling, Sludge /oil removal. Foundations. o All Activities for Excavation and Backfilling Works. Contact First Aiders (if necessary), and members of the Site Safety, Health & Environmental Team, or a member of Site Management by mobile phone or in person to raise the alarm. Energy and Environmental Profile of the U. ISSUE 262, March 7 - 13, 2009 , a large quantity of excavation and backfilling work is going on as well,” says Patze. Retaining Solutions engineers carried out detailed risk assessments (SWMS) along with monthly site audits for quality assurance verification ITP’s. Step excavation side slope with each layer of backfill to avoid the development of unnecessary loads against the structure caused by backfill wedging between the structure and the excavation sidewalls. ) Surface Inspection Prior to Refractory Gunning and Casting. 1 Site planning1. August - Plant Vogtle Units 3 and 4 received an ESP from the NRC. Welcome to our download center. 9 The side of excavation shall be sloped in order to avoid sliding of sig/earth for trench less than 1. View Karani-Checklist-14-01-2020. all internal control doccuments shall be the latest revision 2. Electrical Telecommunication and MEP (Mechanical, Electrical & Plumbing) Works. 4 dealing with water 25 3. 9 TEST PIT EXCAVATION, LOGGING, AND SAMPLING (SOLID) REVISION LOG Revision Number Description Date 9. • Welder/Fitter completes the Weld ITP. The process below describes how to manage Groups for ITP's. h h h h 11. Our documents are provided in editable formats i. NR44 Guide to R44 Earthworks 2 Ed 2 / Rev 0 process, together with careful pre-construction planning, in order to avoid unnecessary delays during construction. Design of footings 315 qqEd Rd≤ where q Ed is the design bearing pressure on the ground (an action effect), and qRd is the corresponding design resistance. Table 1 is an inspection and test plan (ITP) for QA/QC of welders and weld inspection. ITP300-002 Drainage Excavation & Pipelaying. Appendix A Submission (Shop Drawing / Method Statement) Shop Drawings 1. 01 Surveying and setting out 2 ITP. Types of protective systems include sloping, shoring and shielding. - Transmitter Remote Diaph. Inspection and Test Plans set out critical control points or 'hold points' at various stages within a process. The development arm of MAG Group said phase one will be completed by August 2019. Whirlwind Substation: Work included grading down the 500 kV area and backfilling the 220 kV area. A160 Port of Immingham Improvement Scheme Feb 2017 Craig Snow – Costain Contract Lead Richard Pickup - Jacobs Engineering Manager Tiago Magalhaes – Jacobs Geotech Site Representative. I was responsible of the installation of 7 different networks. PCC or RCC, type of elements to be casted, such as RCC slab, columns, footing, beams, walls etc. Work procedure1. CONCRETE PLACEMENT INSPECTION CHECKLIST Quality control of concrete starts with inspection of concrete during pre-placement, during placement and post-placement. You only need to to insert project details and logos etc after which you can submit for client & consultant. The work consists of the construction of rockfill zones of embankments and other rockfills required by the drawings and specifications, including bedding where specified. View Khalid Waleed’s profile on LinkedIn, the world's largest professional community. Civil Works - General - Inspection Test Plan (ITP) - Submit ITPs. DM Civil personnel are trained and experienced in the construction of cement mortar lined Ductile Iron pipelines (DICL). Backfilling shall commence using similar excavated material. A result oriented professional having more than 12yrs. ) Surface Inspection Prior to Refractory Gunning and Casting. Test Records Electronic Process. In This video i am going to tell you what is the basic things as a civil Engineer you should know during checking of Pcc and Backfilling work. Construction of the walls commenced in April 2013 and was completed in July 2013, with total construction duration of three months. • Have a project startup meeting to communicate project goals and expectations. 0 Completion Remarks: H - Company's presence is mandatory for all activities in section. Earthwork in excavation and backfilling of soil upto required depth is required for construction of foundation and trenches. "The modifications were due to begin in mid-March, but the first aircraft only went into modification in early May," president Tim Clark reportedly said. C Head Office O DESCON ENGINEERING L. Tie-in points/interferences encountered during project construction. Excavation and backfilling of precast box sections will be per Sec 206, except a 6" layer of granular mat. DM Civil personnel are trained and experienced in the construction of cement mortar lined Ductile Iron pipelines (DICL). - Inspection and follow up all the site construction work as per the approved procedures and ITP - Responsible for establishing and developing the effective quality assurance system and monitoring quality status, which will give guidance and assistance in achieving project execution quality. experience across telecommunication and power transmission sector. Relevant Process/Specification: ADVERTISEMENTS: Contract specifications 3. ITP100-004 Basecourse Construction. 0 Field Welding 8. Contingencies Mobilization. 2 Preparation1. The various documents required from QC will be stored in Sharepoint with the exception of ones with an electronic process developed. In advance of receiving the companies' ITP application, the Service is providing this notice to request information from other agencies, Tribes, and the public on the scope of the Service's review as well as issues to consider in the NEPA analysis. 00 5 HSR CP1 - JMA Railroad Review and Consultation $ 88,755. docx from MANAGEMENT 501 at Manipal University Dubai. January 2019. To create a Checklist from your ITP, simply change views using the ITP Context Menu, and specify the Check, Verify and Approve status for each line by toggling check boxes. 1 General V. In case of conflict between SiteManager and the ITP frequency, the ITP should govern. This activity uses materials such as concrete masonry units, hollow blocks, solid blocks, insulated blocks, lightweight blocks, glass units, etc. Tingnan ang kompletong profile sa LinkedIn at matuklasan ang mga koneksyon at trabaho sa kaparehong mga kompanya ni Jose Rebecco. The Construction Manager is responsible for monitoring all construction activities, including; the Constructors performance and compliance against this EMP. Manage your building construction ITP in the cloud to eliminate the uploading, downloading and emailing of fragmented documents. Location of excavation: BAC Area / Location: Likely depth of excavation works: ( 300mm to 1. Section Cost: $899. - Approved vender Drawing - Approved drawing - Technical specification(SEC) Inspection Method / Acceptance Criteria - Check fuse rating, main parts rating / type. Purchased check sheets will be made available for immediate downloaded upon payment and you will also be sent an invoice for your records by email. Pre‐construction Safety Meetings V. Download, print or send your inspection test plans as CSV or PDF documents with your logo and branding. Cofferdams to isolate the excavation from the waterway shall be constructed in accordance with the Specifications for Temporary. A160 Port of Immingham Improvement Scheme Feb 2017 Craig Snow – Costain Contract Lead Richard Pickup - Jacobs Engineering Manager Tiago Magalhaes – Jacobs Geotech Site Representative. 2 Excavation 1) Dimension - Location - Level - Line - Profiles 2) Excavated bottom. Developed (ITP's) inspection test plans, and ran Coating Failure Analysis. 00 - Consisting of all 332 QC Checksheets at $12 Each. o All Activities for Dredging Works. В профиле участника KADIR указано 4 места работы. - Inspection and follow up all the site construction work as per the approved procedures and ITP - Responsible for establishing and developing the effective quality assurance system and monitoring quality status, which will give guidance and assistance in achieving project execution quality. 2 Revisions by PJP 6/3/2004 9. 2 relaying turf 24 3. Equipment and tools1. Trench backfill starts one (1) foot over the top of the pipe. The quantity for supplying and placing backfill may be increased during construction to include the quantity of additional backfill material required because of additional excavation to remove poor soils as. Backfill material placed around culverts, abutment wingwalls and piers shall be deposited on both sides to approximately the same elevation at the same time. All supporting documentation should be read prior to works i. 0 Flushing Velocity M/S 10. Excavations, FDT, survey works, form work, rebar and concrete pour, curing, waterproofing membrane, concrete protective coating and backfilling. Utility Relocation. Proven ability in co-ordination of resources, follow up of design and development of plans together with compiling recommendations. 05 Concreting works 6 ITP. Technical Specification. We provide professionally developed method statements, ITP's, checklists, risk assessments and other project related documents. 5 Revisions by VTM 6/21/04 9. 5 temporary drains 25 3. o All Activities for Excavation and Backfilling Works. 1 X H S Checklist 5 Welding procedure prequalification Butt welding/Electro. 2 Overview of methods Quantitative methods aim to estimate both the probability and consequences of adverse. 6 backfilling 25 3. Right-of-Way. Invite other people (internal and external parties) to collaborate on and signoff on your ITP in real-time. CONCRETE PLACEMENT INSPECTION CHECKLIST Quality control of concrete starts with inspection of concrete during pre-placement, during placement and post-placement. 000m³ Excavation works,2. Strong operations professional skilled in Construction Management, Subcontracts Management, Process Scheduling, Quality Control, Interface Management, Oil & Gas, and Construction Safety. doc), PDF File (. During the backfill operation the Inspector should check for the following: 1. All notes must be confirmed by the designer and only included if relevant. Temporary Works. Route 77 Constructors will also integrate the cement stabilized backfill with the MSE walls as shown in the latest TxDOT Houston District MSE wall standard, MSRW-CSB. 000m ground anchoring,50. To reduce potential increases in flows into the drainage system and downstream turloughs during construction, the period of exposure of bare areas and uncontrolled Method Statement: Site Clearance & Topsoil Strip Issue 0 Date. The depth and width of the footing depends on the type of soil and the size and type of the foundation. The rush to move natural gas to markets places pipelines too close to homes, with construction taking place in backyards, farms, pastures, and right at the mailboxes of residents. During construction works it is the responsibility of the Construction Manager to maintain construction workforce training records. Dredging can be done to recover materials of commercial value; these may be high value minerals or sediments such as sand and gravel that are used by the construction industry. [email protected] Structural Excavation and Backfill 401. - Coordinate with the civil laboratory testing - Arranges testing and inspection. Care shall be taken to remove bolder, vegetations and any other deleterious materials. Used to adhere to the ISO 9001 standard for quality management ITPs set out critical points at various stages within a process for scheduled inspections and verifications. 2 Overview of methods Quantitative methods aim to estimate both the probability and consequences of adverse. Almost all types of building sites and construction projects. The Duties and Responsibilil QA/QC Engineer January 15, 2014 The QC Inspector Duties Responsibilities January 26, 2014 Understanding About \ns and Test Plan (ITP) January 21, 2014 Method Statement for E> and Backfilling Works January 22, 2014 The 14 Possible Sources Issues and Defects in Coi - Part 1 July 18, 2016 OUR SPONSORS TRANSLATE THIS. Просмотрите полный профиль участника KADIR в LinkedIn и узнайте о его(её) контактах и. DM Civil personnel are trained and experienced in the construction of cement mortar lined Ductile Iron pipelines (DICL). 16 Backfilling 17esting of sewers T 17 Air testing 17ater testing W 17V surveys CCT 18Connections 6 United Utilities Site Sewer Construction Guide United Utilities Site Sewer Construction Guide 7 Channel types Channel inverts must be constructed using channel. (Water Proofing, Painting, Gypsum Board etc. 5 M Reason for excavating: Work activity description: Nature of work to be undertaken and method. Electrical power network including construction of substations, excavation, backfilling, reinstatement and distribution works. John has 12 jobs listed on their profile. 8) Proper moisture maintained for each layer of material to enable thorough compaction as specified. • Inspection and execution of the work as per the ITP’S and Method of statements. 1 Date of last revision: 18 Jun 10 Page 6 of 17 This document is uncontrolled when printed. 3 Excavation Visual inspection to WRC standards. • Part I covers general requirements on materials, design, reinforcement, manufacturing, acceptance, repair, inspection and product marking. Payment can be made by PayPal Pro secure server. Itp for Ug Piping Works Grp,Frp,GRE Rev. A total of 14,789 tonnes of soil was disposed off-site to landfill at completion of remediation Clean quarry sand was imported to site and used to backfill and compact excavations performed across the entire site. • Welder/Fitter completes the Weld ITP. 0 Flushing Velocity M/S 10. 1 General V. 2 Excavation 1) Dimension - Location - Level - Line - Profiles 2) Excavated bottom. pdf from MANAGEMENT 501 at Manipal University Dubai. Material for rockfill and bedding shall be obtained from the specified sources unless otherwise specified in section 10 of this specification. Fahad Bin Nasir is an excellent engineering professional with management skills within infrastructure operation, engineering and construction industry. CONSTRUCTION QUALITY CONTROL/QUALITY ASSURANCE PLAN PHASE 1 FACILITY SITE WORK CONSTRUCTION HUDSON RIVER PCBs SUPERFUND SITE Prepared For: GENERAL ELECTRIC 319 Great Oaks Office Boulevard Albany, NY 12203 Prepared By: GE Company - Parsons Project Office 381 Broadway, Bldg 40-2 Fort Edward, NY 12828 Phone: 518-746-5311 Fax 518-746-5307. 14 Earthwork excavation, backfilling and compaction 15 ITP. More than 20 years of experience in various aspects of engineering, such as renewable power projects, construction works, project planning, feasibility studies, detailed survey and designs, participate in the preparation technical commercial proposal, urban drainage. Our documents are provided in editable formats i. A sheet of plastic or canvas placed adjacent to the hole. To create a Checklist from your ITP, simply change views using the ITP Context Menu, and specify the Check, Verify and Approve status for each line by toggling check boxes. Purpose and scope 1. Experienced Project Manager with a demonstrated history of working in the construction industry. 5) Waterproofing system properly applied/installed and approved in case of backfill around structure. 000m² Slope Protection (Hydro seeding),150. Large scale bulk earthworks including:. Subdivision Road Construction and Inspection Procedures. It resembles a standard internal concrete vibrator but is much larger and more powerful. Proposed Oil & Gas Coalition Multi-State Habitat Conservation Plan for Ohio, Pennsylvania, and West Virginia, 85250-85254 [2016-28336]. General/Rationale The proper application of fusion bond epoxy powder and liquid coatings in the field on a pipeline construction project, either on girth welds or various required repairs, is an essential element to the successful long-term integrity of a pipeline. During construction works it is the responsibility of the Construction Manager to maintain construction workforce training records. When inputted into SiteManager, the frequency may be translated to a "number format" such as 1 per 500cy that roughly represents the "word format". Purchased check sheets will be made available for immediate downloaded upon payment and you will also be sent an invoice for your records by email. 5 M ( 1 M to 1. No matter where you live the minimum cement content for any residential concrete should be 470 lb. C EN Designation QC INSPECTOR Duration MAY 2013 TO FEB 2014. CONSTRUCTION OF LOAD CENTER -3 METHOD STATEMENT FOR SHORING First Rev. View 02 KHALED VILLA-ITP EXCAVATION. Place backfill uniformly around bridge foundations. The objective of the paper is to study different parameters of risk involved in the form-work and working platform etc. Locate and identify all site utilities that have previously been installed and may be in danger of damage by grading operations. (Castables and Bricks etc. 1 X H S Checklist 5 Welding procedure prequalification Butt welding/Electro. Much of the notes text is provided and will likely remain consistent across all jobs. Right-of-Way. ITP300-004 Drainage Pits / Lintels / Grates. Tingnan ang kompletong profile sa LinkedIn at matuklasan ang mga koneksyon at trabaho sa kaparehong mga kompanya ni Jose Rebecco. All notes must be confirmed by the designer and only included if relevant. 8 Excavation shall be provided with warning barricades, warning signs and flash light and also protected the perimeter of excavation by concrete barrier. A total of 14,789 tonnes of soil was disposed off-site to landfill at completion of remediation Clean quarry sand was imported to site and used to backfill and compact excavations performed across the entire site. It is necessary you add 3 columns in above ITP. Assure proper depth of backfill is attained above box before heavy equipment drives over box. 1 "Backfill of. 02 RELATED WORK SPECIFIED ELSEWHERE A. Purchased check sheets will be made available for immediate downloaded upon payment and you will also be sent an invoice for your records by email. specified backfill material. 2 Removal of Topsoil and Unsuitable Material Topsoil shall be removed over the area, which will be occupied, by the completed works plus a. Marchington Excavation is proud to offer septic system installation and septic system repair services. PCC or RCC, type of elements to be casted, such as RCC slab, columns, footing, beams, walls etc. Scribd is the world's largest social reading and publishing site. abbreviations which are used throughout construction in plans and the proposals (Figure 1-1). SATIP-S-70-03. Site Preparation, Excavation, and Backfill Specification May 2014 Process Industry Practices Page 5 of 18. The ITP must be filled out while the task is being completed and should be completed by those doing the work. Construction industry acronyms - C - Designing Buildings Wiki - Share your construction industry knowledge. 0 Prefab and Welding 6. 1 excavation 24 3.